beautypg.com

Home Legend Engineered Ply T&G User Manual

Page 10

background image

Doc. ID: 140

Rev: 2

Effective: 2/24/2014

Page | 10

Finishing Touches

• Clean the floor.
• Use matching putty where necessary
• Install or reinstall all wall trim pieces. Nail them through the wall, but not to the subfloor to avoid restricting the expansion gap.
• Install transition trim pieces. Nail them to the subfloor, not the flooring.
• At doorways, transitions should be used to protect the edges of the floor and to provide a decorative transition from one floor type to

another.

• If the floor is to be covered, use a breathable material such as cardboard. Do not cover with plastic.