Acolyte RibbonLyte in Screwed-In Channel User Manual
Page 3

All artwork and images copyright Acolyte Industries Inc.
Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
I N S TA L L AT I O N - - S T E P S 1 - 4
1
3
2
4
Mark points every 1 meter (3.28’) along
the intended path of channel. If channel is
shorter than 1 meter, 2 screws will
be used.
Screw in the screws (A) into the pilot hole.
Drill a pilot hole for the screws along each
mark.
PA G E 2
(D)
(A)
Clean the mountain surface free of dust
and debris using a wet cloth. For metal
mounting surfaces use rubbing alcohol (D)
to wipe clean.
(A)
(A)
(A)
(B)
This manual is related to the following products: