Acolyte RibbonLyte in Channel with Mounting Clips User Manual
Page 4

All artwork and images copyright Acolyte Industries Inc.
Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
I N S TA L L AT I O N - - S T E P S 5 - 8
5
7
6
8
PA G E 3
Clean the mountain surface free of dust
and debris using a wet cloth. For metal
mounting surfaces use rubbing alcohol (D)
to wipe clean.
After surface is dry, apply 1/16” double-sided
tape (E) to the desired mounting path of
your RibbonLyte.
(D)
(E)
Remove backing from double-sided tape
(E).
(E)
Remove the backing from the RibbonLyte
(F) that you are going to be applying atop
the double-sided tape.
This manual is related to the following products: