Preparation of chassis – LG WG5005R User Manual
Page 14
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Installation
Preparation of Chassis
1. Insert the guide panels(Type G)
into the guides of the air conditioner
(Type H),Fasten the curtains to the
unit with screws (Type A).
I: Use a long screwdriver and
installing the screws will be easier.
2. Cut the adhesive-backed seal strip
(Type E) to the window width.
Remove the backing from the seai
strip and attach the seai strip to the
underside of the bottom window.
3. Locating unit in window
Open the window and mark center iine
on the center of the inner sill.
4. Attach L bracket
4-1. Install the L brackets behind the
inner window sill, with short side of
bracket as shown. Use the 2 screws
(Type A) provided.
4-2. The bracket helps to hold unit
securely in place. Be sure to place
bracket edge flush against back of
inner sill.
Inner Sill
Outer Sill
Type A ipsWe
Center Line
Outside
L Bracket
14 Room Air Conditioner