beautypg.com

Assembly instructions – ProTemp PT-70-SS User Manual

Page 5

background image

NEVER LEAVE HEATER UNATTENDED WHILE BURNING OR

WHILE CONNECTED TO A POWER SOURCE

© 2014, Pinnacle Products International, Inc.

Oil Fired Radiant Heater User’s Manual

4

Assembly Instructions

PT-70-SS-A

What’s In The Box

Carry Handle (1)

Black Screws (2)

Carry Handle Assembly

1. Align holes in the upper housing with the 2

holes in the handle as shown in Figure 2.

2. Insert screws and tighten firmly.

Tools Needed:

- Phillips Head Screw Driver

Figure 2

- Remove the heater and all packaging materials

from the shipping carton.

Note: Save the box and packaging materials

for future storage.

Figure 3

Attach the handle while still in the box

for easier unpacking. (See Figure 3)