Rack stabilizer feet, Installation tasks, Recommended tools and supplies – Dell POWEREDGE M905 User Manual
Page 10
8
Rack Installation Guide
Rack Stabilizer Feet
CAUTION:
Before installing systems in a rack, install front and side stabilizers on
stand-alone racks or the front stabilizer on racks joined to other racks. Failure to
install stabilizers accordingly before installing systems in a rack could cause the
rack to tip over, potentially resulting in bodily injury under certain circumstances.
Therefore, always install the stabilizer(s) before installing components in the rack.
The stabilizer feet help prevent the rack from tipping over. See the
documentation provided with the rack cabinet for instructions on installing
and anchoring the stabilizer feet.
Installation Tasks
Installing a rack kit involves performing the following tasks in their numbered
order:
1 Removing the rack doors
2 Marking the rack (if necessary)
3 Installing the rail assemblies in the rack:
•
RapidRails installation
•
VersaRails installation
4 Installing the system in the rack
5 Routing and managing data cables
•
Installing the strain-relief bar
•
Using the I/O cable enumerators
6 Replacing the rack doors
Recommended Tools and Supplies
•
A #2 Phillips screwdriver
•
Masking tape or a felt-tip pen, for use in marking the mounting holes
to be used
•
A measuring ruler or tape measure