beautypg.com

Assembly – EcoPure MW_MW30_7301415A User Manual

Page 8

background image

8

Miracle Water Installation & Operation Manual

Assembly

1. Miracle Water models are factory assembled. During installation, remove the Salt Hole Cover.

Set aside to prevent damage. Check the brinewell to be sure it is secured and vertical (see

Figure 1). Slide Faceplate Cover forward to expose back valve assembly.

2. Lift the brine valve out of the brinewell. Be sure the float stem is parallel to stand tube so seals

will seat properly during operation. Replace the brine valve in the brinewell bottom and install

the Brinewell Cover.

3. Install the brine tank overflow grommet and elbow in the 13/16” diameter hole in the back of the

salt storage tank sidewall.