beautypg.com

Installation – Amico Dome Loaded Manifold NFPA User Manual

Page 12

background image

12 Amico Pipeline

Installation

PRECAUTIONS

Tampering with gas specific connections shall be prohibited. Do not alter, remove or modify gas specific connections.

Keep all manifold parts, tools and work surfaces free of oil, grease and dirt. These and other flammable materials

may ignite when exposed to high pressure oxygen or nitrous oxide.

Do not use chemicals, lubricants or sealants unless specified in these instructions.

Before connecting cylinder to manifold, momentarily open and close cylinder valve to blow out dirt and debris.

After connecting cylinder to manifold, open cylinder valve S-L-O-W-L-Y to allow heat of compression to dissipate.

Do not use flame or “sniff” tests for leaks.

Do not apply heat to any part of the manifold system.

Always secure high-pressure cylinders with racks, straps, or chains. Unrestrained cylinders may fall over and

damage or break off cylinder valve.

Do not repeatedly bend, sharply bend, or twist copper pigtails as damage to tubing may occur.

After the manifold wall bracket has been mounted, one person alone should not attempt to lift and hang

the manifold cabinet.

Do not put the manifold into operation until verified by a qualified person as per NFPA 99 or other local

standards.