Mounting the Hanging Bracket

Mounting hardware shall be provided on site by others and shall comply with the local building code.
Amico recommends the fixture to be installed at a height of six feet (1.8m) above
finished floor.
2" x 4" electrical box should be used for electrical terminations.
For feed opening and mounting holes dimensions refer to the drawing of the hanging bracket below.

Use the hanging bracket as a template and make a mark at the pilot holes on the mount surface.

At least six mounting holes are required. *Must be mounted with location pins at top

position.

Using a metal stud finder check if any pilot holes are aligned with a wall studs.
For drywall mounting use 3/16” toggle bolts to secure the back plate. The ½” sized holes are required in
the drywall.
For wall studs mounting Amico recomends using # 10 x 1½” Phillips pan head self-drilling tek screws.