Amico Equipment Rails User Manual
Page 8
7
Amico Accessories Inc.
1. Locate the building studs in the area and align the holes of the rail to the studs. Use a level to make sure the rail is
vertical and mark the locations on the wall through the holes centered on a stud.
2. Remove and put the rail aside. Drill
11
/
16
” (1.7462 cm) diameter holes into the wall at appropriate vertical spacing
according to the specific MRS configuration.
3. Once all the drill holes are completed, insert the ¼-20 x 3” (7.62 cm) Pan Head Machine Screws into the rail and
insert into the toggle wings.
4. With the rail upright, align the toggle bolts to the drilled hole and insert into the studs. Tighten the screws to secure
the rail.
NOTE:
The rubber stop at the bottom of the rail goes over the shank of the bottom screw. The depressible channel
stop at the top of the rail is used to secure the device, keeping it from sliding up and out of the rail tracks.
Refer to specific device instruction manual.
Mounting on Drywall Over Steel Studs Less than 16 Gauge
Section 4: Device Installation
Figure 3
Drywall
Bottom of rail
Bottom of device
Top of rail
4”
Mounting height above floor
Floor
19”
6”
6”
6”
Depressible channel stop.
Depress tab to remove slide/arm
from the wall channel.
Drill hole
Rubber stop
Drill hole
Drill hole
Drill hole
(10.16 cm)
(15.24 cm)
(48.26 cm)