beautypg.com

Great Plains 4000-3S Assembly Instructions User Manual

Page 5

background image

2/22/2005

195-308M

Great Plains Mfg., Inc.

5

Installation Instructions

Figure 6

17088

Figure 7

17089

11. Using the existing tee fittings, connect 72"

hoses from the pressure control valve in the
center (21) to center section cylinders.

IMPORTANT: Connect hoses from "R" (re-
duced pressure) port in the pressure-control
valves to the base end of cylinders. Connect
hoses from "T" (tank) port in pressure-control
valves to rod end of cylinders.

Refer to Figure 7

9.

Using two elbow fittings, connect 72" hoses
from the pressure-control valve on the far left
(19) to left wing cylinders.

10. Using two more elbow fittings, connect 72"

hoses for pressure-control valve on the far
right to right wing cylinders (20).

Refer to Figure 6

8.

At the drill frame, remove the tee fittings (18)
in the wing hydraulic circuit.