Great Plains YP1225A-24TR 24 Twin Row 30-Inch Quick Start User Manual
Page 2

Quick Setup Guide for IntelliAg Model YP1225 30” Twin Row Air Pro
11001-1592-201108
©2011 DICKEY-john Corporation
Specifi cations subject to change without notice.
TABLE C1:
Planter Control
Setup
Default Value/
Value to Enter
Instructions/Defi nitions
Type
Planter Control
Set desired Channel Type as Planter Control.
Material Name
Displays only materials that have been confi gured for the channel
type.
Control Mode
AUTO
Auto is used in normal operating conditions calculating the rate of how
the system is running. Manual mode acts as an override if application
rate sensors are inoperable allowing the use of increase/decrease
buttons to set the fl ow rate for the control. Refer to System Confi gura-
tion section of Operator’s manual for additional information.
Drive Type
PWM
A hydraulic valve varies the oil fl ow to the motor proportioned to the
electric current supplied.
Drive Frequency
100 Hz
If not using a DICKEY-john supplied valve, see the manufacturer’s
specifi cations for drive frequency.
Input Filter
50
Feedback frequency fi lter for the control channel. DO NOT CHANGE.
Gear Ratio
1.900
Specifys the actual ratio from the feedback sensor to the seed meter
shaft RPM. Number of revolutions the feedback sensor turns in rela-
tion to one revolution the seed meter turns.
Sensor Constant
360
Sensor Constant establishes the number of pulses for one revolution
of the feedback sensor. If a DICKEY-john application rate sensor is
used, the value should be set to 360.0.
# of Seed Rows
24
Entry of a specifi c number of seed rows for the control channel.
Row assignment is given a priority based on the channel and will be
assigned sequentially thereafter. Channel 1 is always assigned to the
fi rst set of rows, Channel 2 next set of rows, and so on.
Channel Width
360
Manual entry of the channel width for rows assigned to a specifi c
channel. Width calculation can be determined by # of planter rows
assigned to the channel multipled by the row spacing.
Precharge Time
+ 0.0
Typically used during startup conditions in the fi eld, a Precharge
time is a specifi ed length of time a control channel will operate at the
defi ned Precharge Ground Speed. Must be entered as a positive (+)
number.
Delay Time
- 0.0
Length of time before the control channel will start after the master
switch has been turned ON and the implement switch is in a lowered
position. Must be entered as a negative (-) number.
STEP 6A: Planter Control Channel Setup
(Controlled Hydraulic Drive)
Select Channel 1 and verify that the channel is set to Planter Control.
Enter desired values using Table C1 as reference.
After planter control setup, calibrate hydraulic valve by pressing the Valve Cal
button
.
Ensure implement is raised. With brakes locked and transmission in PARK
position, start engine.
Engage hydraulics and run engine at normal speed until hydraulic fl uid is at
operating temperature.
Verify point row clutches are turned ON.
Do NOT perform this step unless meters are installed in all locations
across planter row units or drive damage will occur.
Press the START button
. Turn the master switch to the ON position.
The valve calibration will immediately start. Keep the hydraulics engaged until
the calibration completes.
When the screen indicates calibration is complete, press the Channel Setup
button
to return to Channel 1 home screen.
Turn the master switch OFF.
To set up additional control channels (planter or fertilizer control), press the
Next Channel button
.
Press the Work Screen button
when channel confi gurations are com-
plete to return to the Main Work screen.
Once a control channel has been established as Planter Control, any new materi-
als established as Planter Control on the Material Setup screen will automatically
be added as optional materials for Planter Control channels on the Control Setup
screen.
1.
2.
3.
4.
5.
6.
7.
9.
10.
11.
12.
2
TABLE B2:
Material Setup
Default Value/
Value to Enter
Ground Driven Metering
Instructions/Defi nitions
Type
Monitor Only
Desired type of application control channel being used for a specifi c
material.
Units
Ks/Ac
S/Sec
Automatically changes with the type of material application selected.
Changes units for target application.
Target Population
32.0
1000s of seeds per acre or hectare (32,000 seeds per acre)
High Pop Alarm
Warns of a high population problem. Values are % based.
Low Pop Alarm
Warns of a low population problem. Values are % based.
On/Off Pattern
Rows can be automatically turned ON or OFF according to the
pattern.
Row Fail Rate
2/1 (2 seeds
every 1 second)
Set to desired number of seeds per second to trigger seed sensor
failure alarm.
STEP 5B: Material Confi guration Setup (Ground Drive Metering)
For Ground Drive Metering, control channels 1, 3, and 4 MUST be disabled
and the Monitor Only feature selected at the Control Setup screen. NOTE: A
Material Name must also be selected at the Row Monitor screen to activate
high and low population alarms.
At the Main Work screen, press the Next Page button
one time.
Press the Control Setup button
.
Select and press one of the Material buttons (Material 1-16).
Enter desired values from Table B2.
Press the Control Setup button
to return to the Control Setup screen.
Repeat steps 3-5 for additional materials.
Press the Channel Setup button
to proceed to the Channel Setup
screen and disable any active channels (Step 6B).
1.
2.
3.
4.
5.
6.
7.
STEP 6B: Planter Control Channel Setup
(Ground Driven Metering)
NOTE: When using a ground drive/nonhydraulic application to monitor
population, control channels 1, 3, and 4 must be disabled and Material Setup
confi gured for Monitor Only. A material name must also be selected on the
Row Monitor screen.
Press the Channel Setup button
.
Select Channel 1 and verify that the channel is set to Disabled.
Press the Next Channel button
to change control channels 3 and 4 to
Disabled.
1.
2.
3.