358q – Great Plains CP1000 Predelivery Manual User Manual
Page 13
CL
L
C
YELL
OW LEAD
TO LEFT LIGHT
TO RIGHT LIGHT
GREEN LEAD
CHAIN ROUTING DETAIL
158 mm (6.22 in.)
95 mm (3.75 in.)
17880
CP1000 ASSEMBLY
157.9 mm (6.2 in.) SPACING
OPENER SPACING
190.5 mm (7.5 in.) SPACING
0
25
12t
12t
12t
12t
17t
17t
17t
12t
27
817-
026c
side
hinge
partition
outer mount holes
endview
123
-356
d
12gage
123
-356d
1
2gage
123
-356
d 12gage
123
-356d
1
2gage
end
vie
w
12t
SMALL SEEDS
FERTILIZER
SEED
16T
12t
12t
12t
REVERSE DRIVE
FERTILIZER
SEED
148-358Q
15
See also other documents in the category Great Plains Gardening equipment:
- 1200 Parts Manual (210 pages)
- 706NT Material Rate (46 pages)
- 706NT Material Rate (50 pages)
- 2N-2410 Operator Manual (56 pages)
- 2N-2410 Operator Manual (48 pages)
- 12 Series Drills Assembly Instructions (6 pages)
- X-PresS 2006 Assembly Instructions (50 pages)
- TM500 Operator Manual (62 pages)
- 2010HDP Operator Manual (166 pages)
- YP1630F Material Rate (42 pages)
- YP2425 Operator Manual (162 pages)
- 3S-5000 Operator Manual (94 pages)
- 3PYP Operator Manual (188 pages)
- 3N-3010P Assembly Instructions (2 pages)
- 3N-3010 Assembly Instructions (9 pages)
- 3N-3010P Assembly Instructions (9 pages)
- PFH-15 Predelivery Manual (23 pages)
- PFH-15 Operator Manual (26 pages)
- PFH-15 Operator Manual (46 pages)
- P15126 Serial No 12724 (34 pages)
- DVN 8321 Operator Manual (38 pages)
- 3P500 Assembly Instructions (22 pages)
- 3P600 Assembly Instructions (12 pages)
- 605NT Assembly Instructions (8 pages)
- 605NT Assembly Instructions (4 pages)
- CPH-12 Assembly Instructions (3 pages)
- YP1625A-2420 24 Row 20-Inch Quick Start (6 pages)
- 8323 FCF Predelivery Manual (124 pages)
- P13937 (20 pages)
- 3323 DH Parts Manual (114 pages)
- YP3025-1820 25 Series 18 Row 20 Inch Quick Start (5 pages)
- CF500 Operator Manual (38 pages)
- PFH-15 Assembly Instructions (30 pages)
- 3500TM Parts Manual (106 pages)
- 1800TM Parts Manual (158 pages)
- YP2425A-2470 24 Row 70 cm Quick Start (5 pages)
- Simba Culti Press Operator Manual (38 pages)
- RU1999 Parts Manual (58 pages)
- 3N-30P Assembly Instructions (10 pages)
- 2510HDP Operator Manual (180 pages)
- YP1220 Parts Manual (136 pages)
- 3P500 Material Rate (68 pages)
- YP2425-3620 36 Row 20 Inch Quick Start (5 pages)
- 706NT Operator Manual (53 pages)
- 706NT Operator Manual (22 pages)