Operation, transport, & maintenance, Operating procedure – Wheatheart GHR Augers Intake Hopper User Manual
Page 13

W
HEATHEART
- I
NTAKE
H
OPPER
3. O
PERATION
, T
RANSPORT
, & M
AINTENANCE
BH/GHR A
UGERS
3.1. O
PERATING
P
ROCEDURE
30735 R1
13
3. Operation, Transport, &
Maintenance
3.1. OPERATING PROCEDURE
Figure 3.1
1. For other auger-related placement instructions, please refer to your auger
operation manual.
2. Remove tow bar from hopper. Place auger/hopper in desired location (for
example, under a bin hopper). See Placement instructions in auger operator
manual.
3. Set the hopper to self-level by disconnecting transport channel at top end.
4. To clean out after use, remove the cleanout cover by removing the four 5/16”
nuts holding it in place and use a vacuum or other tool to clean out.
This manual is related to the following products: