Exide Technologies GB3979 User Manual
Page 6

10.
WATER ADDITIONS
Maintain electrolyte levels above the top of the separators, but no higher than 1/8" from
the bottom of the vent well. Check the electrolyte level weekly, or as necessary
depending on battery use prior to charging. If the level is not visible (below the top of the
separators), add just enough water to cover it and then proceed with charging the
battery. Otherwise, defer watering the battery until the end of the charging period when
the battery is fully charged and the charger has tapered to its finish rate. At that time, add
enough water to bring the electrolyte level to 1.25” of the top of the cover. Always use
distilled water or water that is known to be free of abnormally high amounts of impurities.
Contact your local GNB Industrial Power representative if you are not sure of your water
quality.
11.
SERVICE AND PARTS
Your local GNB Industrial Power sales representative has more information regarding the
full range of maintenance and repair service available. GNB Industrial Power can also
supply all of your battery, charger, and accessory device replacement part needs. For
more information in the U.S.A. and Canada, call 1-888-563-6300. All others, please
contact your local GNB Industrial Power battery sales representative.
12.
RECYCLING
U.S. Federal and State Regulations require that lead acid batteries be handled and
disposed of in compliance with strict guidelines. GNB Industrial Power offers disposal
service for lead acid batteries. Call 1-888-438-5865 to arrange a pick-up or to get
additional information.
BATTERIES MUST BE VISUALLY INSPECTED PER
THE ABOVE SCHEDULE EVEN WITH THE USE OF A WATERING SYSTEM.
JAR
HIGH
WATERING
LEVEL
LOW
WATERING
LEVEL
COVER
VENT WELL
POST
1.25”
2.0”
Page 6