List of contents, Relevant documents, Series gu/f – Richter GU/F Series Overflow Valves User Manual
Page 2
Series GU/F
Page 2
9530-070-en
Revision 00
TM 6908
Edition 10/2007
List of Contents
List of Contents ........................................ 2
Relevant documents................................. 2
1 Technical data...................................... 3
Name plate CE- and body identification...... 3
Component identification............................. 4
Tightening torques....................................... 4
Screw-in tool for .......................................... 5
Pressure/temperature diagram ................... 5
2 Safety.................................................... 5
Intended use................................................ 6
For the customer / operator......................... 6
Improper operation ...................................... 6
3 Safety notes for applications in
potentially explosive areas based on
the Directive 94/9/ EC (Atex 95) .......... 6
Intended use................................................ 6
4 Safety note for valves, certified to
Clean Air Act (TA Luft) ........................ 7
5 Transport, storage and disposal ........ 8
Transport securing ...................................... 8
Storage ........................................................ 8
Return consignments .................................. 8
Disposal....................................................... 9
6 Installation............................................ 9
Sizing of the inlet line .................................. 9
Sizing of the outlet line ................................ 9
Discharge conditions and reaction forces
Valve connecting dimensions.................... 10
Flange caps and gaskets .......................... 10
Direction of flow and installation ............... 10
Grounding ................................................. 11
Installation ................................................. 11
Gas-tight design (Option).......................... 11
Signal transmitter (Option) ....................... 11
7 Operation............................................ 12
Initial commissioning................................. 12
Shutdown .................................................. 12
Recommissioning...................................... 12
7.4
Improper operation and their consequences
............................................................... 12
8 Malfunctions....................................... 13
9 Maintenance ....................................... 13
Screw connections .................................... 13
Cleaning .................................................... 13
Modification of the overflow valve ............. 14
Adjustment of the test pressure ................ 14
9.5
Important notes on dismantling / installation.
............................................................... 14
Replacement of components .................... 14
Installation of the thrust ring
Tests ......................................................... 15
10 Drawings............................................. 16
Legend ...................................................... 16
Sectional drawing GU ............................... 17
Views......................................................... 18
Dimensional drawing................................. 19
Relevant documents
Data sheet
Declaration of conformity acc. to the EC Pressure
Equipment Directive 97/23/EC
Form for Safety Information Concerning the
Contamination QM 0912-16-2001_en
On request :
Pressure spring table
Bellows operating ranges, TIS 0587-02-0006