Required parts list – Klimaire 13 SEER Series User Manual
Page 12
IMPORTANT NOTE:
These instructions are intended as a method to tie-down system to cement slab as a
securing procedure for high wind areas. It is recommended to check Local Codes for
tie-down methods and protocols.
REQUIRED PARTS LIST
see detail A
#7
Χ 3/8“ screws
1/4
” Χ 1-3/4“ Hex Washer Head Concrete Screws
(3/16
” Pilot Hole Needed. Pilot Hole 1/4” deeper
Than The Fastener Embedment)
11
3.9 FACTORY-PREFERRED TIE-DOWN METHOD
Fig.8 FACTORY-PREFERRED TIE-DOWN METHOD
Fig.7 RECOMMENDED ELEVATED INSTALLATION
ELEVATION ABOVE ANTICIPATED
SNOW IS NECESSARY
BASE PAD
(CONCRETE OR
OTHER SUITABLE
MATERIAL)
BASE PAN (BOTTOM VIEW) DO NOT
OBSTRUCT DRAIN HOLES
(SHADED)