GBC Usp13 User Manual
Page 9

7
Position front (#49) and rear (#56 & #48) supply stack guides so that the posts clear the
paper stack by about 1/16”. A stack of 2 to 3 inches is required.
Locate adjustable stack guide post (#59) so that the post is in line with the separating knife.
(Figure 13).
Install front guide rail (#55) so that there is about 1/8” to 1/4” clearance between the lift
being transferred and the front guide rail.
Cycle machine and check results.
48
56
49
59
29
55
108
TO BE IN
LINE
Figure 13
Figure 14
See also other documents in the category GBC Equipment:
- HeatSeal H310 (2 pages)
- AdvancedPunch (50 pages)
- AdvancedPunch (20 pages)
- C366 (38 pages)
- C210 (40 pages)
- 54C (44 pages)
- 44T (48 pages)
- Proclick Pronto (15 pages)
- TL2900 (38 pages)
- Sys4b (3 pages)
- Digicoil (17 pages)
- Stl1000 (43 pages)
- SureBind System 2 (3 pages)
- SureBind System 1 (6 pages)
- P70ix (27 pages)
- MP2500ix (58 pages)
- MP2000 PB (24 pages)
- Magna Punch (36 pages)
- Catenas (53 pages)
- 2064WF (30 pages)
- MS5 (51 pages)
- EBA 721-05 LT (24 pages)
- 150 Creasematic (10 pages)
- Auto 50 MBM Crease (21 pages)
- 2000 Plockmatic Bookmaker (56 pages)
- BM 200 Bookmaker (52 pages)
- 61 Plackmatic Bookmaker (28 pages)
- 1244WFC Tital (39 pages)
- 1040WFC Arctic Titan (26 pages)
- 640T Laminator (36 pages)
- H600 Heatseal Laminator (8 pages)
- 5100 Fusion Laminator (144 pages)
- 62fm (40 pages)
- 56FM (40 pages)
- 44DT (36 pages)
- 27C (32 pages)
- 25e (48 pages)
- 5000L EU Fusion (108 pages)
- 3000L EU Fusion (108 pages)
- 1100L EU Fusion (76 pages)
- 1000L EU Fusion (76 pages)
- 5100L Fusion Swingline (12 pages)
- 5000L Fusion Swingline (28 pages)
- 3000L Fusion Swingline (28 pages)