Power components service, Disassembly, Assembly – E-flite UMX B-17G Flying Fortress BNF User Manual
Page 10
10
EN
Power Components Service
CAUTION: DO NOT handle propeller parts
while the fl ight battery is connected. Personal
injury could result.
Disassembly
IMPORTANT: Service only one motor at a time.
Propellers and hardware are not interchangeable.
1. Disconnect the battery from the
ESC/receiver.
2. Carefully cut the tape on each nacelle and
remove the bottom half.
IMPORTANT: Removing tape or decals can
remove paint from the fuselage.
3. Hold the prop shaft using needle-nose
pliers or hemostats.
4. Turn the propellers as shown to remove and
install.
5. Hold the nut (A) on the end of the prop
shaft using needle-nose pliers or
hemostats.
6. Turn the gear on the shaft to remove the nut.
7. Gently pull the shaft (B) from the gearbox (C)
and make sure the washer (D) and two
bushings (E) are not lost.
8. Disconnect the motor from the ESC/
receiver.
9. Gently push the motor out of the
gearbox and remove the motor
through the bottom of the nacelle.
NOTICE: DO NOT remove the gearbox from
the aircraft. Damage to the aircraft will result.
Assembly
Assemble the aircraft using the instructions
above in reverse order.
• Correctly align the prop shaft gear with the
pinion gear on the motor.
• Connect the motor to the ESC/receiver. Ensure
that the propellers spin in the correct direction.
When facing the front of the aircraft, the left
propellers spin clockwise, the right propellers spin
counter-clockwise.
• Make sure a left or right propeller is installed on
the correct side. A propeller marked with an “R”
is for the left side when faceing the front of the
aircraft.
• Assemble each nacelle using clear tape.
B
E
C
D
Rem
ov
e
In
sta
ll
Insta
ll
Re
mo
ve
A
R