beautypg.com

Operation, Opera t ion – Bush Hog 1945 User Manual

Page 60

background image

OPERATION

1945 01/11

Operation Section 4-14

© 2011 Alamo Group Inc.

OPERA

T

ION

LOADER BOOM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly
installed.

Check condition of bushings at boom pivot
points.

Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-L-0005_B

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses,
cylinders and fittings.

IMPORTANT: DO NOT

use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.

Inspect the condition of the valve weldment.

Ensure fitting is properly connected

Inspect condition of bushings. OPS-L-0018_B

Hydraulic Hoses

BUCKET INSPECTION

Ensure all pins are in place.

Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.

Inspect the condition of the bucket lug
weldments.

Inspect condition of bushings.

OPS-L-0007_B

Bucket Pins