voltage, percent of readiness (estimated), and amount of charge in mAh input in it since the battery 
insertion. 
 
Test/Discharge circuit (optional) 
With the Test/Discharge circuit installed, the charger becomes a complete battery management system 
enabling battery characterization, as well as identifying anomalies resulting from aging and other deficiencies. 
The test performed is a full charge-discharge-full charge routine. This test will identify the true capacity of the 
battery displayed on the LCD panel. The discharge circuit closely approximates actual real life discharge, as 
seen by the battery in normal camera use. The circuit is associated with channel 1.
Camera Power Output (optional)
The camera power supplied is 7.2V up to 1.5A. The charger is capable of providing camera power, while 
charging batteries. When all 4 fully discharged batteries are inserted, the rate of charge will be automatically 
reduced as needed in order to balance total power consumption. This results in a slight lengthening of the total 
charge time. 
Operation
Charging 
Operation of the charger is fully automatic. Mount any battery to any open position on the charger 
and the charger will initiate the charge routine. While charging is in progress, the LCD display will 
indicate the battery voltage, estimated readiness in percent, and amount of charge accepted by the 
battery. Upon charge completion, the display will report the position number (1-4), amount of charge 
the battery has absorbed, and the completion message. 
Upon the battery insertion, the charger will identify the battery’s state of charge, and initiates the 
appropriate charge regimen. If the inserted battery is fully charged, it cannot safely absorb charge. 
The charger will display the “ # 1(2,3,4) Ready” message. 
 
Note: 
•
Estimated readiness is intended for the “charge in progress” status information. Accuracy may vary for an old 
or new battery, and between different sizes and makes. 
•
Amount of charge absorbed by the battery is displayed from the moment of insertion. If a fully depleted 
battery charged in full, the charge displayed is equal to the actual battery capacity in mAh. 
•
Upon the battery removal, please wait 2-3 seconds before inserting a new battery in the same position, as the 
charger channel needs this time to initialize. 
 
Status LEDs 
LEDs help to quickly identify charging state. 
1. Fast blink 
Battery is inserted; charge in progress
2. On
Battery is ready (charged over 90%)
3. Slow blink
Test in progress
 
Testing (optional feature) 
•
Insert the battery to be tested in position 1.
•
Press “Test” button
A letter “t” will be displayed while channel 1 status information is shown 
The charger will fully charge the battery, fully discharge using its internal load (LCD will display 
“Discharging”), and then fully charge for complete readiness. The amount of charge delivered to the 
load is displayed on the LCD panel. This is the true battery charge capacity in mAh. 
 