Bonide Fungonil RTU User Manual
Page 3

VEGETABLE DISEASES Cont.
RING SPOT IN BRUSSELS SPROUTS (CA only) - Begin at time of early sprout
development or when conditions favor disease development. Repeat at 7 to 10 day
intervals. Do not apply more than 38 gal. per 1,000 sq. ft. per season.
CARROTS (7): Cercospora (Early) Blight and Alternaria (Late) Blight - Begin when
disease threatens and repeat at 7 to 10 day intervals or as required to maintain control.
Do not apply more than 47 gal. per 1,000 sq. ft. per season.
CELERY (7): Cercospora (Early) Blight and Septoria (Late) Blight; Basal Stalk Rot and
Pink Rot (Suppression) - Begin when plants are set in the field. Repeat at 3 to 7 day
intervals or as needed. Do not apply more than 57 gal. per 1,000 sq. ft. per season.
CORN (SWEET) (14): Helminthosporium Leaf Blight and Rust - Begin when conditions
favor disease development. Repeat at 4 to 7 day intervals or as needed. Do not apply to
sweet corn for processing. Do not apply more than 28 gal. per 1,000 sq. ft. per season.
CUCUMBERS (0), MELONS (0), PUMPKINS (0), SQUASH (0): Anthracnose, Downy
Mildew and Target Spot; Scab, Gummy Stem Blight (Black Rot) Leaf Blight, Cercospora
Leaf Spot, Powdery Mildew (except Southwestern states). Also suppresses Fruit Rot
(Rhizoctonia) on cucumbers - Begin when plants are in the first true leaf stage or when
conditions are favorable for disease. Repeat applications at 7 day intervals or more
frequently if required. Do not apply more than 50 gal. per 1,000 sq. ft. per season.
ONION (GREEN) (14) AND DRY BULB (7), LEEK (14), SHALLOT (14), GARLIC (7):
Botrytis Leaf Blight (Blast), Purple Blotch and Downy Mildew (suppression) - Apply at
first sign of disease and repeat at 7 to 10 day intervals. For green onions, leek and
shallot, do not apply more than 21 gal. per 1,000 sq. ft. per season; for dry bulb onions
and garlic, do not apply more than 47 gal. per 1,000 sq. ft. per season.
POTATO (7): Early Blight, Late Blight, Botrytis Vine Rot - Begin when plants are 6 inches
high or when disease threatens and continue at 7 to 10 day intervals or as needed to
maintain disease control. Do not apply more than 35 gal. per 1,000 sq. ft. per season.
TOMATO (0): Early Blight, Late Blight, Gray Leaf Spot, Gray Leaf Mold, Septoria Leaf Spot,
Anthracnose, Alternaria Fruit Rot or Black Mold, Rhizoctonia Fruit Rot, Botrytis Gray Mold -
Begin when conditions favor disease development. Repeat at 7 to 10 day intervals or more
frequently under severe conditions. Do not apply more than 47 gal. per 1,000 sq. ft. per season.