beautypg.com

Operating features – Wood’s Powr-Grip EO1DCB User Manual

Page 4

background image

Rev 10.0/9-13

2

EO1DCB: #35191AFT

OPERATING FEATURES

Note: Components featured in the following instructions for installing, using or maintaining the

DC Vacuum Back-Up System are underlined on their first appearance in each section.













FIGURE 1: Back-Up System with Local Power Switch












FIGURE 2: Back-Up System with Remote Power Switch

1 VACUUM HOSE FITTING

3 BATTERY TEST BUTTON

5 BATTERY GAUGE

2 POWER SWITCH (FIG. 1) OR

ELECTRICAL CONNECTOR (FIG. 2)

4 BATTERY CHARGER

6 Enclosure with BATTERY,

VACUUM PUMP and VACUUM
SWITCH