beautypg.com

Assembly – Wood’s Powr-Grip MT2HV11DC User Manual

Page 8

background image

Rev 10.0/6-13

6

MT2HV11DCO-DVS: #35082

ASSEMBLY

1) Open the shipping container and remove all materials for restraining or protecting the vacuum

lifter. Save the container for use whenever the lifter is transported.

2) Suspend the lifter from a crane as follows: Select hoisting equipment (crane and hoist, when

applicable) rated to carry the maximum load weight plus the lifter weight (see
SPECIFICATIONS: Maximum Load Capacity and Lifter Weight).
Note: Any application of the lifter must conform to all statutory or regulatory standards that

relate to the hoisting equipment when used in its geographical location (eg, relevant OSHA

standards in the USA).

WARNING: Hoisting equipment hook must be fitted with restraining latch to

prevent lift bail from slipping off under any circumstances.

Raise the lift bar to a vertical orientation and attach the hoisting equipment hook to the lift

bail.
Note: Some hoisting equipment hooks could interfere with an upright load that extends

beyond the lifter's pad frame. If the load would contact the hook during lifter operation, the

operator must prevent this by attaching a sling (or other rigging that does not interfere with
the load) between the hook and the lift bail.

WARNING: Any sling used must be rated to carry maximum load weight plus

lifter weight.

Use the hoisting equipment to raise the lifter out of the shipping container. Be careful to

avoid damaging the vacuum pads. Remove the pad covers and save them for use whenever
the lifter is stored.

3) Connect the electrical connectors uniting the battery to the battery charger and the vacuum

generating system. Now the lifter is operational.

4) Perform Operational and Load Tests for the lifter as directed in MAINTENANCE: T

ESTING

S

CHEDULE

.