Assembly, Cf13ceo) – Wood’s Powr-Grip CF15CEO User Manual
Page 9

Rev 0.0/11-11
7
CF-CEO: #35186AFT
ASSEMBLY
T
O
E
MPLOY
P
AD
F
RAME
T-A
RM
A
SSEMBLIES
(CF13CEO)
MRTALP-DC shown with Pad Frame T-Arm Assemblies and VPFS625 pads.
Assemble the vacuum lifter as directed in the lifter's instruction manual. However, instead of
standard extension arms and vacuum pads, install the 2 Pad Frame T-Arm Assemblies with all 4
vacuum pads and connect all the vacuum hoses, as directed in the following sections. Note: Use
only 2 pads on each T-arm.
Installing/Removing T-Arm Assemblies
1) Remove the cotterless hitch pin from the mounting arm of one
Pad Frame T-Arm Assembly by pulling on the pull ring.
2) Insert the end of the mounting arm as far as possible into its
socket on the lifter's main pad frame (see preceding
illustration), so that the holes align for the cotterless hitch pin.
3) Secure the mounting arm in the pad frame by pushing the
cotterless hitch pin through the holes until the retaining ball emerges on the far side of the
pad frame socket.
4) Connect the 2 vacuum hoses on each T-arm assembly to the nearest available connection
points on the main pad frame, as directed in the section Connecting/Disconnecting Vacuum
Hoses to follow.
Note: If the lifter is equipped with a dual vacuum system, 2 air-line circuits are identified by
color-coded vacuum hoses. In order to ensure maximum effectiveness of the dual vacuum
COTTERLESS HITCH PIN
1 PULL RING
2 RETAINING BALL