Vigo VG06021 User Manual
Page 5
STUD
FIG.1
8
5
MODEL VG06021
PREPARATION STEPS TO FOLLOW BEFORE INSTALLATION
IMPORTANT
To prevent damage to the finish, you should protect the shower cabin bottom with a cardboard
protector before beginning the installation.
Ensure that there is sufficient structural support behind the shower wall to hold the weight of the
shower door. If there is insufficient enough support, then reinforce the shower walls with wooden
studs prior to shower door installation. [SEE FIG.1]
1.
Place the bottom rail (#8) to the desired position on the shower base and center its sides on the
base.
2.
Use a level to check the horizontal position of the rail. See page 3 for recommended A and B
distances. Verify that the A and B distances are correct.
3.
Seal the underside of the bottom rail with clear silicone. Center the rail sides to the base
according to the A and B measurements.
4.
Apply silicone to 3/4" screw (#16) threads. [SEE FIG.3]
5.
Screw the bottom rail securely to the base with 3/4" screws. [SEE FIG.2]
6.
Clip the aluminum cover to the front piece of the bottom rail.
FIG.2
FIG.3
INSTALLATION STEPS
A. INSTALLING THE BOTTOM RAIL
1.
Remove the plastic layer from the base border (if needed). Do NOT remove the plastic layer off
the plastic platform of the base.
2.
Properly apply silicone to the wall and base joints.
3.
Make sure to read corresponding base instructions carefully prior to install on the Vigo Brand
Shower Door System. Failure to do so can cause water leakage and bodily harm.
CAUTION
!
GASKETS NEED TO BE IN BETWEEN ALL GLASS AND METAL CONTACT. FAILURE TO
DO SO CAN LEAD TO BREAKAGE AND POTENTIAL BODILY HARM.