Dpa dpb : quick-start guide – Sulky VISION 1 DPB Quick set-up User Manual
Page 3

DPA DPB : Quick-start guide
MAIN menu
Shows if the hydraulic shutters
are opened or closed
Shows the electric
actuator position
g
Perform a rate calibration test
When using the buckets :
- Press on , the cursor moves to calibration test.
- Confirm by pressing , the electric actuators are
in position, from here, follow the on-screen instructions.
- Press on « start »
- Engage the DPA and drive.
- Let the fertiliser flow ( ! Max capacity of buckets)
- Weigh the collected fertiliser.
- With the numeric keypad, enter the weight and confirm with
The T-factor has been updated and you are now ready to work.
When using a weighbridge :
- If you can weigh the machine, then weigh it once
- Perform the calibration test and spread over an area (from 0.2 to X ha ), weigh the machine
again and enter the exact weight of fertiliser actually spread, confirm with
- The T-factor has been updated and you are now ready to work.
Shows the type of fertiliser
Press to operate the TRIBORD
and select the right / left or both
discs for rate modulation
Enable rate modulation
f
Set the quantity per ha
- Use the numeric keypad
- Confirm with
Réf : 400369 GB/DIS - 01
Page 3
07/2007