Assembly / installation ..... continued – Schwank Parasol Series Post Mount 24 volt User Manual
Page 11

4BN/L6-24,4SN/L5 -24 Manual
IM100310
RD: MAR, 2010
RL: 1A - BA
11
ASSEMBLY / INSTALLATION ..... CONTINUED
8. Reflector Assembly to Burner:
6. Make gas connection, installing a union and 1/8” NPT plugged tap for pressure testing (both
field supplied) between gas supply and the gas hose
7. Connect 24Vac power supply to wires from burner - tuck wiring inside post
Check that the post and the burner assembly stand vertically plumb.
Make sure all bolts and nuts are tightened.
Ensure all gas connection is sound and the installation conforms to local and national codes.
Perform leak testing of all gas connections (see page 12)
Ensure electrical supply and connection to local and national codes.
Setup is now complete.
8. Install Reflector:
Install a washer onto each wing bolt
Align holes in reflector to those in the brackets
at top of burner
Secure reflector to burner with wing bolts.