beautypg.com

Assembly instructions – Marshalltown SW100H Shockwave Vibratory Screed User Manual

Page 5

background image

5 of 16

104 S. 8th Ave. Marshalltown, IA Phone 800-888-0127 / 641-753-0127 • Fax 800-477-6341 / 641-753-6341 www.marshalltown.com

WS570
R10-15-12

INSTALLING THROTTLE CABLE:

Step 1 – Remove carburetor cover by pressing clips .

Step 4 – Attach the throttle lever to the “T” grip handle,
as shown above .

Step 3 – Fasten the throttle cable as shown . Make sure
there is a nut on each side of plastic fitting . Made sure the
cable does not work itself out of the plastic fitting
while tightening .

Step 2 – The throttle has a rotating silver peg (A) with a slot
on one side of it . One end of the throttle cable has a metal
barrel (B) that fits into this slot . Insert barrel into the slot so
when the throttle cable is pulled, it will pull the throttle open
(toward the base plate of the screed) .

ASSEMBLY INSTRUCTIONS

A

B