Ride on, Ergo ii with floorboards, Installation – Kuryakyn 4059 ERGO II/6 ARMS with FLOORBOARDS User Manual
Page 3

PAGE
3
STEP 9
While holding the floorboard, align the pins on the floorboard with the holes on the Top Hat step
adapter then loosely secure the 5/16” fastener from Step 7 to the
floorboard,
to
hold
the assembly together. DO NOT tighten the fastener at
this time.
STEP 10
Repeat Steps 2 through 9 for the opposite side.
ADJUSTING THE POSITION OF SWINGARM AND
LIGHTED
FLOORBOARDS
STEP 11
Adjust for Longer or Shorter Inseam Lengths:
•
Loosen the 1/2”-13 Button Head Fastener securing the swingarm to the
mount. Pull the swingarm out of the interlocking cogs.
•
Rotate the swingarm to the desired position then push the arm back
into the interlocking cogs; be sure the swingarm is either level with the
engine guard, or above the engine guard. NEVER position the
swingarm below the engine guard! FIG 1 Retighten the 1/2”-13
fastener.
IT IS THE INSTALLERS RESPONSIBILITY TO ENSURE
THERE IS SUFFICIENT CORNERING CLEARANCE
BEFORE RIDING. ALWAYS POSITION THE SWINGARM
EITHER LEVEL WITH, OR ABOVE THE ENGINE GUARD.
POSITIONING THE SWINGARM BELOW THE ENGINE
GUARD WILL GREATLY DECREASE CORNERING
CLEARANCE WHICH MAY CAUSE LOSS OF CONTROL
RESULTING IN SERIOUS INJURY OR DEATH.
STEP 12
Adjust the Clevis Angle:
•
Loosen the fastener securing the floorboard to the swing arm.
• Pull the floorboard outward to disengage it from the roll pins; rotate the floorboard to the
desired angle.
• Secure the fastener. Install the black thread plug in the swingarm. PIC 4
It is the installer’s responsibility to ensure that all of the fasteners (including
pre-assembled) are tightened before operation of the motorcycle. Küryakyn will
not provide warranty coverage on products or components lost due to improper
installation or lack of maintenance. Periodic inspection and maintenance are
required on all fasteners.
Ride On!
ERGO II with FLOORBOARDS
INSTALLATION
FIG 1
PIC 4
BLACK PLUG
GOES HERE