beautypg.com

Setup and assembly – Environmental Express SimpleDist User Manual

Page 7

background image

800.745.8218 / 843.576.1147 / www.environmentalexpress.com

Environmental Express

• 5

SimpleDist:

Operation and Instruction Manual

Getting Started

Setup and Assembly:

1. Unpack the heating unit and place it in a chemical fume hood with the temperature controller facing outward. (If

you are purchasing a manifold kit to use with a previously purchased HotBlock

TM

, skip to step 2).

2. Unpack boiling flasks. The boiling flasks should be cleaned according to laboratory protocol and assembled in the

SimpleDist

TM

block.

3. Unpack the bags of tubing which were packed with the heating unit.
4. Review the diagrams and familiarize yourself with parts, names, and locations of the parts for the chemistry you are

doing.

5. Save original packaging material in a dry area for use if unit needs to be returned for service. Refer to warranty

policy on page 1.

6. Assemble the vacuum manifold and base supports and then tighten 4" set screws using an 3/16" Allen

wrench.

7. Place vacuum manifold containing flow control valves behind the heating block. Slide the manifold forward until

base supports surround the heating block on both sides.

8. Connect vacuum tubing to the PVC barb located on the left leg of the vacuum manifold. An excess vapor trap

containing NaOH solution may be inserted between the manifold and the vacuum source.

9. Open the C6142 Tubing Kit to find the lengths of silicone tubing with tubing on one end and barbed fitting adaptors

into the other end. Depending on the manifold purchased, there are 6 or 9 long tubes for the front positions and 6
or 9 shorter tubes for the back positions. Insert the end with the barbed fitting adaptors into the flow control valve.
Pull back on the orange locking collar of the valve and then push the adaptor firmly into the valve.
Note: See Tubing Valve Assembly, Figure 1, page 12.

10. The glassware/plasticware for the SimpleDist

TM

System is assembled as follows:

a. Place a boiling tube into one of the left-most distillation block positions.
b. Place a washer (Catalog # 6120A) on top of a 2-port cap insert. Then, place a 2-port cap insert into one of the

closures (green cap).
Note: See Boiling Tube Assembly drawing, Figure 2, page 13.

c. Thread a closure/cap insert assembly onto the boiling tube.
d. Insert an assembled disposable reagent addition tube/tip into the smaller port on the cap insert.
e. Fit a collection trap into the larger top port of the cap insert.
f. Connect tubing/tubing adaptor onto the top of the collection trap.
g. Repeat steps A through F for the remaining glassware, working from left to right.
h. To remove the glassware, reverse the above procedure.

Note: See drawing #C6000, Figure 3, page 14, for complete assembly diagram.