beautypg.com

Hotblock, Unpacking and installation, Installation requirements – Environmental Express SimpleDist User Manual

Page 10: Unpacking your hotblock, Electrical requirements

background image

800.745.8218 / 843.576.1147 / www.environmentalexpress.com

Environmental Express

• 8

SimpleDist:

Operation and Instruction Manual

About Your HotBlock

TM

HotBlock

TM

Unpacking and Installation

Unpacking Your HotBlock

TM

:

1. Remove the HotBlock

TM

from the shipping container by lifting from the bottom of the block. The lid should not be

used for lifting.

2. Your HotBlock

TM

is shipped with metal screws securing the bottom panel. The metal screws must be removed before

operating your HotBlock

TM

. Remove the metal screws and replace them with the PVC screws and rubber feet included

with your shipment. The corrosion-resistant PVC screws and rubber feet are designed to secure the bottom plate.

Important: Do not over tighten the PVC screws!

Installation Requirements

Locate the HotBlock

TM

under a fume hood with a minimum face velocity of 100fpm, and allow a minimum of 2" of space on

all sides. The following environmental conditions should be observed:

• Ambient temperature range:

5-30°C

• Ambient relative humidity:

0-90%RH

• Altitude:

sea level to 2500 meters

HotBlocks

TM

are rated as Pollution Degree 2 and Installation Category 2.

Electrical Requirements

Required Voltage:

120 volts, ~60Hz, 15A

(all

HotBlocks

TM

are also available in 240V

with

CE

mark)

Power should not vary greater than±10%. Use the supplied heat-resistant power cord or equivalent to connect to the power
supply.
For safety reasons, a separate power receptacle should be provided for each unit in the system. Do not use extension cords or
outlet adaptors. Make certain that power outlets are earth-grounded at the grounding pin.
See individual specifications for each HotBlock

TM

model.