beautypg.com

C.B.S. Scientific GCSGE-040-02 User Manual

Page 7

background image

C.B.S.  Scientific

Econo-Sub Productivity Package

7

SECTION 3
Instructions for Use
3.1 Econo-Sub Unit Preparation

Place Econo-Sub unit on a level work surface in an authorized work area. Level Econo-Sub unit
by placing the bubble level in the center of the unit and adjusting the four leveling screws on the
of base until the unit is level.

Place the adjustable height comb(s) assembly in the gel tray. Loosen the white screws holding
the comb to the backing and adjust comb depth (generally 2mm). Gently retighten the adjusting
screws and set the comb aside. See Table 1 and 2 for comb volumes.

Coolant Circulation:
A selection of white tubing adapters (right angled and straight) is provided with each unit. For
coolant circulation, screw tubing adapters into fittings on side of internal cooling chamber, located
under the gel bed. Connect a heavy wall tubing which will not kink (if tubing kinks, excessive

pressure build-up may occur and damage unit) and attach a regulated pump or recirculating
water bath (follow manufacturer’s instructions). Flow rate is not to exceed 3 liters per minute. Do
NOT
use tap or house water as it can be subject to large fluctuation in pressure.




Buffer Recirculation:
Buffer recirculation is recommended for longer runs to maintain uniform pH and ionic strength and
to reduce buffer changes. Unit is shipped with buffer circulation ports sealed with four white
plugs. For cycling buffer, remove plugs and replace with threaded tubing adapters. Using tubing
adapters and pump, cycle buffer from anode (+) to cathode (-).




RIGHT ANGLE

TUBE FITTINGS

FLOW

PUMP HEAD

PERISTALTIC

STRAIGHT

TUBE FITTINGS

-

+

TO CHILLER

This manual is related to the following products: