beautypg.com

Step 23, Step 24, Step 25 – Aladdin Light Lift ALL700-CM(Two Circuit Fixtures Only) User Manual

Page 10: Step 26

background image

STEP 23

Adjust screw collar rings so top of canopy is just below edge of bottom contact plate. Canopy should be at

least 1 ¾” deep. See Diagram I.
Never allow the chandelier canopy to make contact with the ceiling before the contact plates meet. This

could interfere with the automatic shutoff system and could cause the chandelier to fall, which could

cause death, personal injury, and/or property damage.

STEP 24

Loosen bottom screw collar ring to allow easy wire access. See Diagram I.

STEP 25

Run chandelier wires through screw collar or threaded stem and pull through fixture coupler holes. See

Diagram I.

STEP 26

Wire nut chandelier wires to bottom contact plate wires. Black (hot circuit 1), Red (hot circuit 2),

white (neutral), and green (ground). See Diagram I. Bare ground wire from chandelier can not touch

underside of bottom contact plate. A direct short will occur.

Diagram I

Top of Canopy

Just Below Edge

of Bottom

Contact Plate

1¾” Deep

Canopy

Wire Nut Chandelier

Wires to Bottom

Contact Plate Wires

Bottom Screw

Collar Ring

Pull Chandelier

Wires Through

Screw Collar Loop/

Threaded Stem and

Fixture Coupler