2 cable installation, 3 startup procedure, 4 operational readiness check – ADS-TEC OPC5115 User Manual
Page 14: Industrial pcs opc5115

Industrial PCs OPC5115
14
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
5.2
C
ABLE INSTALLATION
The device interfaces and power supply plug are found on the side of the casing. The free
slots and the drives are found in the same place.
5.3
S
TARTUP PROCEDURE
•
For 230 V AC device: Insert the power cable in
the IEC connector and connect it to the power
source.
•
For 24 V DC device:
Place the cable end
sleeves of the power cable wires in the terminals.
•
Connect the cable for serial / parallel data transfer and fasten the plugs to the sockets.
•
Connect all further required cables and secure against slippage.
5.4
O
PERATIONAL READINESS CHECK
•
Connect the power cable to the power source.
•
Check the device to determine whether hidden damages have been caused by
improper transport, incorrect operation or storage conditions or improper handling
(e.g. smoke emission from the device, etc.). If damages are found, immediately
shut down the device and protect it against unintentional startup.