beautypg.com

9 drive belt replacement, English – Echo CH45342 Owners Manual v.3 User Manual

Page 23

background image

4.5 INCH CHIPPER

19

ENGLISH

SERVICE & MAINTENANCE

BEFORE INSPECTINg OR SERVICINg ANy PART OF THIS MACHINE, SHuT OFF POWER SOuRCE,

DISCONNECT SPARk Plug WIRE FROM SPARk Plug AND MAkE SuRE All MOVINg PARTS HAVE COME TO A COMPlETE STOP.

WaRNING

Figure 5.4, Front belt drive replacement

5.9.1 ENGINE modELS

place the chipper engagement lever in the StaRt

1.

position.
Shut engine off.

2.

Disconnect battery cables (electric start models).

3.

Remove the belt guard by removing the 5/16" bolts.

4.

Remove the idler pulley.

5.

place the chipper engagement lever in the CHIppInG

6.

position.
loosen the four carriage bolts attaching the engine

7.

plate to the trailer.
locate the two 5/16 x 3" bolts and 5/16" nuts located

8.

on the side of the chipper between the trailer and the

engine plate.
loosen both 5/16" flange nuts.

9.

To release the tension on the belt, loosen both 5/16

10.

x 3" bolts equally and slide the engine towards the

chipper housing.
Remove the old belt and install the new belt. loosen

11.

the belt guide if needed.
Adjust the drive belt.

12.

position the belt guide 1/8" over the belt and tighten

13.

bolts.
place the chipper engagement lever in the StaRt

14.

position. Reinstall the idler pulley.
Reinstall the belt guard.

15.

5.9.2 pTo modELS

FRoNT dRIvE bELT

Move the engagement lever to the RElEASE

1.

position.
Disengage PTO and shut off tractor engine.

2.

Remove the PTO shaft from the tractor and disconnect

3.

from the 3 point hitch.
Remove the four 5/16 x 5/8" hex bolts and four 5/16

4.

x 3/4" hex bolts securing the front belt shield to the

chipper housing. Remove the shield and set aside.
Remove the front bearing snap pin. Then, remove the

5.

1/2 x 1-1/2" bolts that connect the front bearing to the

bearing support weldment.

5.9 dRIvE bELT REpLaCEmENT

Remove the four 3/8 x 1" carriage bolts, washers and

6.

nylock nuts securing the bearing support weldment

to the chipper housing. Remove bearing support

weldment and set aside.
loosen the eye bolt to release tension on the belt

7.

(Figure 5.4).
Remove the 3/8 x 3-3/4" hex bolt, washers and nylock

8.

nut securing the idler pulley to the idler bracket.

Remove the idler pulley.
Remove the old belt and install the new belt.

9.

Reattach the idler pulley to the idler bracket.

10.

Tighten the eye bolt until belt deflection is 1/4" when a

11.

9 lb. load is placed against the belt (Figure 5.4).
Slide the bearing support weldment onto the rotor

12.

shaft. Secure the weldment to the chipper housing

with four 3/8" x 1" carriage bolts, washers and nylock

nuts. Attach the front bearing to the weldment with two

1/2 x 1-1/2" bolts, washers and nuts. Tighten bearing

bolts to 120 ft-lbs.
Reinstall bearing snap ring.

13.

Reinstall the front belt shield using four 5/16 x 5/8"

14.

hex bolts, four 5/16 x 3/4" hex bolts and eight 5/16"

flat washers.

This manual is related to the following products: