Assembly, 1 attach trailer wheels, 2 attach pintle hitch – Echo 72928 Owners Manual v.7 User Manual
Page 10: 3 attach rear stabilizer
9 INCH CHIPPER
6
Section
aSSemblY
2
2.1 aTTaCH Trailer WHeelS
Remove the chipper from its shipping crate. Place the
1.
unit on a level surface before attempting to assemble
it.
Raise the trailer several inches from the ground with a
2.
hoist or jack. Support the chipper securely.
lift one wheel to a hub and align the wheel lug holes
3.
with the hub lug bolts. Thread the lug nuts onto the
bolts and tighten them to 75 ft-lbs. Follow a star pattern
when tightening the lug bolts. Repeat this step for the
remaining wheel.
noTe
Axle and hitch assemblies for "S" models are supplied
by the distributor and may vary from the illustrations
shown below.
2.2 aTTaCH PinTle HiTCH
Insert the adjustable hitch into the hitch opening in the
1.
chipper trailer.
Attach the pintle hitch ring to the adjustable hitch with
2.
two 5/8" x 4-1/2" bolts, washers, and centerlock nuts.
Torque the bolts to 160 ft-lbs.
Connect the safety chains to the adjustable hitch
3.
weldment as shown in Figure 2.1. Use a 3/8" x 2-1/2"
bolt, two washers, and a nylock nut to attach the safety
chains.
Push the top link pin through the holes in the hitch and
4.
trailer. Secure the top link pin with a lynch pin.
Adjust the ring on the pintle hitch to make the chipper
trailer as level as possible when connected to the towing
vehicle.
SAFETY
CHAIN
3/8” x 2-1/2”
BOLT
3/8”
WASHER
5/8” x 4-1/2”
BOLT
PINTLE
RING
5/8” CENTERLOCK
NUTS
5/8”
WASHERS
3/8”
WASHER
3/8”
NYLOCK
NUT
LYNCH
PIN
TOP LINK
PIN
Figure 2.1, Trailer hitch assembly
The rear stabilizer (Figure 2.2) is installed by sliding the
stabilizer into the trailer support guide on the rear of the
chipper frame. The stabilizer is secured and adjusted with
the provided snap pin.
2.3 aTTaCH rear STabilizer
Figure 2.2, Rear stabilizer