beautypg.com

Assembly, Install blower pipes/stick handle, Assembly pb-760 ln h/t – Echo PB-760LNT User Manual

Page 14

background image

14

X7531125002

© 03/2013 ECHO Inc.

ASSEMBLY

PB-760 LN H/T

ASSEMBLY

PB-760 LN H

Never perform maintenance or assembly procedures with engine running or serious personal injury
may result.

Install Blower Pipes/Stick Handle

1. Assemble clamps (A) onto both ends of flexible pipe (B).
2. Assemble swivel pipe (C) into flexible pipe (B) and tighten

clamp (A).

3. Assemble flexible pipe (B) to elbow (D) on blower and

tighten clamp (A).

Note: A light lubricant may be used to ease assembly of flexible

pipe to blower elbow.

4. Loosen wing nut (E). Align notches (G) in handle clamp with

tabs (H).

5. Slide stick handle onto swivel pipe (C). Stick handle (F)

should be angled away from operator.

6. Position stick handle (F) for comfortable operation. Tighten

wing nut (E).

7. Assemble straight pipe w/silencer (J) onto swivel pipe (C),

until you feel light resistance. Do not force connection. Hold
swivel pipe and turn straight pipe clockwise, engaging
positive locking channels, until connection is firm. Do not
force connection.

8. Assemble straight pipe (K) to straight pipe w/silencer (J) as

in step 7.

Note:

Blower use will eventually loosen pipe connections. Exclusive

positive locking system allows pipes to be tightened. If
loosening occurs, remove two straight pipes and install
according to instructions 7 & 8.

A

B

C

D

A

B

C

E

G

F

H

C

J

K

This manual is related to the following products: