beautypg.com

Cold weather operation, Operation pb-760 ln h/t – Echo PB-760LNT User Manual

Page 22

background image

22

X7531125002

© 03/2013 ECHO Inc.

OPERATION

PB-760 LN H/T

Cold Weather Operation:

1. Remove back cushion (A) from frame.
2. Install intake cover (B) on frame over air intake.

3. Install back cushion (A) to frame over intake cover.
Note: Blower performance may be reduced slightly.

A

B

This manual is related to the following products: