Section 5 - Attachments
5-39
31200745
Personnel Work Platform - Fork Mounted
Use Appropriate Carriage Attachment Capacity Chart
To determine maximum capacity, refer to “Telehandler/
Attachment/Fork Capacity” on page 5-4.
The operator and personnel in platform must read and understand the
separate personnel work platform manual prior to installing and using a
platform.
The joystick (1) controls lift/lower and extend/retract movement of the boom.
The tilt switch (2) controls platform tilt.
• Press left side of switch to tilt up.
• Press right side of switch to tilt down.
Installation Procedure:
• Ensure carriage is properly installed. Refer to “Attachment Installation” on
• Secure the fork mounted platform to the forks by sliding the fork mounted
platform onto the parent forks and install the retaining pin behind the vertical
shank of the fork.
OY1610
OY2960
1
2