15 lifting and tie down, Lifting, Tie down – JLG 1250AJP Operator Manual User Manual
Page 73: 16 stowing the jib for transport, 15 lifting and tie down -19, Lifting -19 tie down -19, 16 stowing the jib for transport -19

SECTION 4 - MACHINE OPERATION
3121170
– JLG Lift –
4-19
4.15
LIFTING AND TIE DOWN
Lifting
1.
The weight of the machine is stamped on the serial number 
plate. If the plate is missing or illegible, call JLG Industries or 
weigh the individual unit to find out the Gross Vehicle 
Weight.
2.
Place the boom in the stowed position with the turntable 
locked.
3.
Remove all loose items from the machine.
4.
Attach lifting device and equipment only to the designated 
lifting points.
5.
Properly adjust the rigging to prevent damage to the 
machine and so the machine remains level.
Tie Down
WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY LOWERED INTO
THE BOOM REST.
1.
Place the boom in the stowed position with the turntable 
locked.
2.
Remove all loose items from the machine.
3.
Secure the chassis and the platform using straps or chains of 
adequate strength and attached to the designated tie down 
points.
4.16
STOWING THE JIB FOR TRANSPORT
1.
Place the boom in the stowed position with the axles 
retracted.
2.
Hold the Jib Swing control switch to the right until the plat-
form will no longer swing. 
NOTE:
The Jib Swing function is not operable when the Capacity Select
control is in the 1000 lb. (454 kg for ANSI markets and 450 kg
for CE and Australia markets) position.
NOTE:
Automatic platform leveling is disabled when stowing the jib.
3.
Push and hold the Jib Stow Override control switch until the 
jib and platform are in the stowed position under the boom.
