beautypg.com

6 maintenance forms, 7 co2/ln2 back-up system service checklist, Maintenance forms – Eppendorf LN2 Backup System User Manual

Page 27: Back-up system service checklist, 6 maintenance forms 8.7 co

background image

Maintenance

New Brunswick LN2 Back-up System

English (EN)

27

8.6

Maintenance forms

8.7

CO

2

/LN

2

back-up system service checklist

Period

Place the task

Task

Personnel

Weekly

Near device

Clean with damp rag if
necessary.

User

Weekly

Near LN

2

supply

Weigh LN

2

supplies to

see if they are full.

User

Monthly

Near device

Check for cuts or
abrasions on all electrical
wires.

User

Inspect all hoses for cuts,
chaffing, and squashing.

Inspect hose connection
to bottle and seal
connection on the bottle.
There should be no
damage or corrosion.

Inspect manifold plugs
and seals. There should
be no mechanical
damage or corrosion.

Inspect LN

2

supply

connection and solenoid
valve connection. There
should be no damage or
corrosion.

Once every 5 years or
when battery fails

Near device

Replace battery.

Qualified service
engineer

NOTICE!

Service should check the following points.

Refer to user manual sections as indicated.

1.

Check Back-up system components for wear and any damage.

2.

Check system and gas supply installation (see

LN

2

gas supply installation on p. 18).

3.

Check system connections for leaks (see

Test for gas leaks on p. 18).

4.

Test the injector valve operation (see

Testing the solenoid valve on p. 21).

5.

Test the door switch operation (see

Testing door switch on p. 21).

6.

Test overall system operation (see

Testing back-up system operation on p. 22).