Operation, Opera t ion – Bush Hog 3327 User Manual
Page 58
OPERATION
3327 01/11
Operation Section 4-14
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADER BOOM ASSEMBLY
•
Inspect condition of each arm section weldment
•
Ensure all pins are in place.
•
Ensure all bolts and screws are properly
installed.
•
Check condition of bushings at boom pivot
points.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-L-0005_B
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses,
cylinders and fittings.
IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve weldment.
•
Ensure fitting is properly connected
•
Inspect condition of bushings. OPS-L-0018_B
Hydraulic Hoses
BUCKET INSPECTION
•
Ensure all pins are in place.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
•
Inspect the condition of the bucket lug
weldments.
•
Inspect condition of bushings.
OPS-L-0007_B
Bucket Pins