Maintenance – Snorkel TM12-sn54000+CE User Manual

Page 14

background image

Page 10

Operation Manual

MAINTENANCE

Maintenance

Never perform service while the platform is elevated without first blocking the elevating assembly. DO

NOT stand in the elevating assembly area while deploying or storing the brace.

Figure 7: Supporting the Elevating Assembly

BLOCKING THE ELEVATING ASSEMBLY

INSTALLATION

1. Park the machine on firm level ground.
2. Verify that both Emergency Stop Switches are ON.
3. Turn and hold the Chassis Key Switch to CHASSIS.
4. Position the Chassis Lift Switch to UP and elevate the platform

approximately 1,2 m (

4 ft.).

5. Place a solid wood block, 51mm x 100mm x 45cm (

2”x 4”x18”)

between the second mast section and Chassis just behind the
mast assembly.

6. Push the Chassis Lift Switch to the DOWN position and

gradually lower the platform until the second mast section is
supported by the block.

REMOVAL

1. Push the Chassis Lift Switch to the UP position and gradually raise platform until the wood block can

be removed.

2. Remove the block.
3. Push the Chassis Lift Switch to the DOWN position and completely lower the platform.

HYDRAULIC FLUID

The hydraulic fluid reservoir is located in the chassis door.

Figure 8: Hydraulic Fluid Reservoir and Dipstick

NOTE: Never add fluid if the platform is elevated.

CHECK HYDRAULIC FLUID

1. Make sure that the platform is fully lowered.
2. Open the chassis door.
3. Check the fluid level using the guage on the tank.
4. To add Hydraulic fluid remove Filler Cap in Fig 8.
5. Add the appropriate fluid to bring the level to the

FULL mark. See “Specifications” on page 14

!

!

W A R N I N G

Number 2 Mast

Wood Block

Filler Cap and

Level guage