Spider Bushing Replacement

Refer to Figure #9 for bushing installation:

1.

Install (4) inner bushings into spider, using long side
of installation tool #60703 to ensure proper bushing
depth.

2.

Using the opposite end or short end of installation tool
#06703, install (4) outer bushings into spider.

Parts Replacement Cycles and Tolerances

3/4 - 14 PIPE TAP

TUBE 1 1/4 I.D. X 4" LONG

6459 BUSHING

PUSH ROD 3/4" X 8 1/2"

Figure 8

Inner Bushing

Outer Bushing

Figure 9

Air Cleaner Element

Replace after 100 hours if the engine is operating under good clean air conditions.
Service and replace more frequently if under more severe conditions.

Bearings

Replace anytime a bearing is rough, binding, discolored or removed from housing or
shaft.

Blades

Replace when the edges become sharp or uneven. (Finish blades can be reversed)

Bushings, Trowel Arm

Replace if the trowel arm can be moved up and down more than 3/4 inch (19 mm) at
the end of the arm.

Carriage Bolts

Reset the height after trowel arm teardown or if the trowel develops chatter or
windmilling. Use height gage kit #07277 when setting.

Clutch

Replace clutch if it does not disengage below 2000 rpm.

Gaskets and Seals

Replace at every overhaul and teardown. Use MBW gasket and seal kit #05470.

Gearbox Oil

Replace after the first 50 hours of operation, then every 500 operating hours or yearly
thereafter.

Spark Plug

Change after 75 hours of operation.

Torque Bolts

Re-torque all the bolts after the first eight hours of operation and check every 25
hours thereafter.

Worm Gear

Replace if the teeth show wear marks or become sharp.

Worm Shaft

Replace if the teeth show wear marks or become sharp.