beautypg.com

Step 4: non-tension end, Step 3: tension end – Mueller Roll-Up Door L250 User Manual

Page 5

background image

WWW.MUeLLeRinC.CoM 5

Axle Support

Axle

Wall

Set Screws

step 4: non-tension enD

a

Slide axle support over axle, with arrow pointing toward wall.

Axle

Dual Tensioner

Wall

Tensioning Hub

Spring Roll Pin

Set Screw

step 3: tension enD

RigHt siDe of DooR

(LooKing fRoM tHe insiDe oUt)

is ReCoMMenDeD

a

Using dual tensioner assembly’s spring roll pin located in knurled wheel,

rotate upward in the direction that clears the axle.

B

Slide dual tensioner assembly over axle and tensioning hub, with arrow

pointing toward wall. Release spring roll pin.

This manual is related to the following products: