beautypg.com

Mueller Roll-Up Door L250 User Manual

Page 4

background image

4

877-2-MUeLLeR

DO NOT CUT BANDS OR wRAPPINg UNTIl INSTRUCTED.

a

Check wall opening width and height and verify these
measurements against size of door to be installed.

B

Verify that jambs are plumb.

C

Check floor and header for level.

D

Check for adequate side clearance at jambs and clearance

above and at sides of header. See Clearance charts for
minimum requirements.

e

Verify that the guide mounting surface on the jamb is flush.

f

Make sure all parts required for installation are with the

door; see parts list in hardware box.

g

Required tools

a. Tape measure
b. 3/8 inch nut setter
c. 1/2 inch drive socket set
d. Adjustable wrench / pliers
e. leveling device; water or laser level recommended
f. Pocket / utility knife

step 2: attaCHing gUiDes to MoUnting BRaCKets

a

Attach the guides to the Mounting Bracket with the

hardware provided.


NOTE:

Door will be assembled on the floor & raised

into position.

step 1: WaLL opening

This manual is related to the following products: