beautypg.com

Peeling and scraping, Operation, Opera t ion – Bush Hog 2545 User Manual

Page 74

background image

OPERATION

2545 01/11

Operation Section 4-30

© 2011 Alamo Group Inc.

OPERA

T

ION

It is important to keep the bucket level when
approaching a bank or pile. This will help prevent
gouging the work area.

PEELING AND SCRAPING

Use a slight bucket angle, travel forward and hold
lift control forward to start the cut. Make a short 5 to
8 foot angle cut and break out cleanly.

With bucket level, start a cut at notch approximately
2 inches deep. Hold depth by feathering bucket
control to adjust cutting lip up or down. When front
tires enter the notch, adjust lift cylinder to maintain
proper depth.