Shovel attachment, Seite ist rechts 15 mm schmäler (klappseite), Operating weight and ground pressure – Liebherr R 9100 User Manual
Page 21: Digging envelope, Bottom dump buckets

R 9100
21
Seite ist rechts 15 mm schmäler (Klappseite)
Shovel Attachment
with Shovel Boom 5,30 m/17’4”
R 2620
m
ft
35
40
30
25
20
15
10
5
0
-5
-10
12
13
11
10
9
8
7
6
5
4
3
2
1
0
-1
-2
-3
-4
11
12
10 9
8
7
6
5
4
3
2
1
0
40
35
30
25
20
15
10
5
0
m
R0199
ft
T
Operating Weight and Ground Pressure
The operating weight includes the basic machine with shovel
attachment and a 7,00 m
3
/9.2 yd
3
bucket.
Undercarriage
HD
Pad width
mm/ft in 600/1’11”
750/2’5”
Weight kg/lb 113.500/250,200 114.600/252,650
Ground pressure *
kg/cm
2
/ psi 1,80/25.53
1,45/20.62
* according to ISO 16754
Digging Envelope
Stick length
3,70 m/12’1”
Max. reach at ground level
10,70 m/35’1”
Max. dump height
7,60 m/25’
Max. crowd length
3,70 m/12’1”
Bucket opening width T
2.000 mm/ 6’6”
Max. crowd force at ground level (ISO 6015)
545 kN/122,521 lbf
Max. crowd force (ISO 6015)
704 kN/158,265 lbf
Max. breakout force (ISO 6015)
585 kN/131,513 lbf
Bottom Dump Buckets
For materials classe
according to VOB, Section C, DIN 18300
< 5
< 5
5 – 6
5 – 6
5 – 6
5 – 6
7 – 8
7 – 8
7 – 8
Typical operation
according to VOB, Section C, DIN 18300
GP
GP
HD
HD
HD
HD
XHD
XHD
XHD
Capacity ISO 7546
m
3
8,70
7,50
7,50
7,00
6,40
5,60
7,00
6,40
5,60
yd
3
11.4
9.8
9.8
9.2
8.4
7.3
9.2
8.4
7.3
Suitable for material up to a specific weight of
t/m
3
1,3
1,7
1,6
1,8
2,0
2,4
1,5
1,8
2,2
lb/yd
3
2,192
2,867
2,698
3,035
3,373
4,047
2,530
3,035
3,710
Weight kg 12.600
11.400
12.000
11.400
11.000
10.400
13.200
12.400
11.600
lb 27,778
25,133
26,455
25,133
24,251
22,928
29,101
27,337
25,574
Wear kit level
I
I
II
II
II
II
III
III
III
GP:
General purpose bucket with Liebherr Z90 teeth
HD:
Heavy-duty bucket with Liebherr Z100 teeth
XHD:
Heavy-duty rock bucket with Liebherr Z100 teeth
Level I: For non-abrasive materials, such as limestone, without flint inclusion, shot material or easily breakable rock,
i.e. deteriorated rock, soft limestone, shale, etc.
Level II: For preblasted heavy rock, or deteriorated, cracked material (classification 5 to 6, according to DIN 18300)
Level III: For highly-abrasive materials such as rock with a high silica content, sandstone etc.
NTB_R9100_T_enGB-US_Druck.indd 21
11.06.14 11:03