beautypg.com

Lubrication schedule, Lubrication schedule -4, Maintenance – Bush Hog 2387 User Manual

Page 94

background image

MAINTENANCE

2387 01/11

Maintenance Section 5-4

© 2010 Alamo Group Inc.

MAINTENANCE

Lubrication Schedule

Before operating your Loader, take the time to inspect and repair any damage to the machine or tractor. Only a
minimum of time and effort is required to regularly maintain this machine to provide long life and trouble free
operation.

Lubricate all grease fittings: one at each end of lift boom arms and one at rod and base ends of each lift and
bucket cylinders.

NOTE: Fully retract bucket to a comfortable height to grease bucket/loader boom joint. Do not reach or stand
under a raised loader or attachment without proper support.